Maintenance
Equipment, maintenance requests worked from a board, preventive plans that open their own requests, teams, downtime and reliability reports.
Maintenance
Maintenance keeps your equipment running: what you own, what broke, who fixes it, what it cost and what is due next. Vehicles from Fleet are assets here too.
Equipment
The Equipment list is the register. Open a machine to edit it in place — name, serial, location, the technician, purchase and warranty dates and the work centre it belongs to in Manufacturing (its downtime then reduces that centre's capacity). The record shows the latest meter readings and the machine's maintenance requests. Record meter reading (engine hours or odometer) fires any meter-based plan the reading makes due.
Requests
A request is a work order on one asset. Report an issue (New) asks for the asset and a title; you can also give a planned date, a priority and a team. On the request:
| Action | What it does |
|---|---|
| Assign | Picks the technician, and optionally the team and the planned date. |
| Start | Moves it to In progress and records when work started. |
| Complete | Asks how long the work took; can record downtime and the meter. |
| Cancel | Closes it without work; can record downtime. |
| Add part | Takes a part from a stock location at its stock value (needs Warehouse). Type the quantity in the part's unit — 1.5 — up to three decimals. |
| Add labour | Minutes × an hourly rate, in the work order's currency. |
| Post labour | Books a completed work order's labour to the ledger. |
The Parts and labour tab lists the work order's lines. While the request is open and its labour is not posted, Remove takes a line off with a reason; a part goes back to stock at the value it left with.
The Board shows requests by status. Drag a card to move it: to Assigned (you, when nobody is), In progress (starts it), Done (completes it with the time since it started) or Cancelled. A request never goes back to Reported, and Done / Cancelled are final.
The Calendar shows a month at a time — use the arrows or Today. A request sits on its planned day; one nobody planned yet sits on the day it was reported. Click an entry to open the request.
Preventive plans
A plan repeats every N days from a start date, or every N units of a meter (engine hours, odometer). Every field on the plan saves — change the interval and the next due value is recomputed. Preventive requests open on their own: a background job opens the next occurrence of each active time-based plan (one open request per plan), and a meter reading opens the request of a meter plan it makes due.
Teams
Teams (in the module's settings menu) groups technicians. A request can be routed to a team; a team with open requests cannot be deleted.
Maintenance settings
Settings (in the module's settings menu) holds the two accounts Post labour books a done request's labour to, picked from your chart of accounts: the Labour cost account (an expense account) and the Labour offset account (an asset or liability account, usually wages payable or a labour clearing account). Until both are chosen, labour can be recorded but not posted. Spare parts are not posted here — Warehouse books them when they leave stock. Each picker saves as soon as you choose; choosing the accounts needs the right to manage the books as well as settings, and anyone without it sees them read-only.
Downtime and reports
Downtime lists every logged stop across the register. Reports (needs read access to every request) shows, for a period, each asset's failures, MTBF (hours per failure), MTTR (mean repair minutes), downtime and work-order cost per currency, and the spare parts consumed.
Ask the Concierge
- "Report a hydraulic leak on Press 1, urgent, for tomorrow 8:00."
- "Assign the leak on Press 1 to Ana and start it."
- "Record 1,250 engine hours on the compressor."
- "Show the maintenance report for September."