Recipes, work centres and manufacturing orders — what you build, from what, and what it cost.

What it does

Manufacturing turns components into finished products and records what that cost. You describe a product's recipe once, then raise an order each time you build it. Completing an order consumes the components, adds the finished goods to stock, and writes down the money.

Open Manufacturing from the launcher (/dashboard/manufacturing).

The three things you set up

Work centres (Manufacturing → Work centres) are where work happens: a press, an assembly line, a bench. Each carries a capacity, an efficiency and an hourly cost in a stated currency — and a calendar: the weekly shift pattern (Mon–Fri 08:00–16:00 with an hour's lunch is one click) and any downtime you record against it, whether planned maintenance, a repair, a setup or a changeover. The calendar shows the next seven days of available minutes, in your browser's timezone and saying so; the scheduler that will lay work orders on it comes later.

Bills of materials (Manufacturing → BOMs) are the recipes: what a product is made from, which routing steps build it, and any byproducts that come out alongside it.

Manufacturing orders are one build: this product, this many, from this recipe.

Recipes are versioned

A new recipe starts as a draft. Nothing can be built from it until you release it. The moment you do, the version that was in use stops being offered for new orders.

A released version is never edited. To change a recipe, start a new version — a copy you can edit and release in turn. The list shows each recipe's version and state, so "which recipe did we build that from?" always has an answer.

A version cannot be released if its components would form a loop (a part that is, somewhere down the chain, made from itself), and you cannot retire a version while draft orders still name it — confirm or cancel those first.

Booking a release for later

A draft can also be booked to go live at a date and time you choose — useful when a recipe change lands with a supplier switch or a price change on a known date. At that moment the version in use stops being offered for new orders and the booked one takes over, exactly as if you had released it by hand then. The history records the booked moment, so an order confirmed thirty seconds after it gets the new recipe.

While booked, the draft is read-only and shows a banner with the time; cancel the booking to change it, then book again. One booking per recipe at a time. If the recipe can no longer be released when its time comes (a loop introduced since, for instance), it stays booked and is reported every minute rather than quietly dropped — cancel it or fix the cause.

What a recipe line can say

  • Expected scrap. A percentage you expect to lose on that component. Consumption is grossed up by it, so what you issue matches what the floor actually uses.
  • Optional. The component is not consumed automatically; it is issued by hand when it is needed.
  • The step that consumes it, when the recipe has routing steps.
  • Kits. A component whose own recipe is marked as a kit is unpacked into its parts when an order is confirmed, rather than being treated as a stocked item.

Running a build

  1. Create the order — pick the product, the quantity and (optionally) the recipe. The order starts as a draft with no number.
  2. Confirm it. This is the moment that matters: the order takes its number and freezes the recipe. Changing or replacing the recipe afterwards will not change this order. Work orders appear from the routing, the quality checks whose product, category or work centre match are raised, and the components are held at the consume location (up to what is free) so other orders cannot take them. An order with no locations takes the default warehouse's stock; with several warehouses and none marked default, set the locations yourself — completing refuses to guess.
  3. Work through it. Steps run in their order: a later step waits until the steps before it are finished. Start opens your clock on a step, Pause and Finish close it, and the clocked minutes add to the step. You can also type the minutes; once a completion has costed them they can grow but not shrink.
  4. Complete it — in full or in parts. Components leave stock, finished goods arrive, and a production-cost record is written. In the Mark done dialog you can pick which lots of a tracked component are used, adjust what was actually consumed (less, more, none, or a component the recipe does not list), and close the order when less was built than planned. The recipe's Consumption setting decides: strict refuses any deviation, warning asks you to confirm it, flexible records it. Building more than planned follows the same rule.

Partial completions add up exactly: splitting an order into three does not consume more or less material than building it in one go.

An order made for a sale (a make-to-order route) shows the sale and its due date, and its finished goods are held for that sale as soon as they exist.

What a completion records

Completing an order moves stock through the warehouse: components leave the consume location and the finished goods (and any byproducts) arrive at the produce location, valued at exactly what the components were worth in the stock ledger. Every completion writes a row under Production costs on the order:

  • what the components were worth,
  • what the good units absorbed,
  • what the scrap cost.

Money is kept in whole units of the currency (cents for the euro), at that currency's own precision. A build is costed in your organisation's valuation currency — the one your stock is valued in — and every amount is rounded once with your organisation's rounding policy, exactly as the warehouse values the same stock. Scrap you did not plan for is charged as a loss rather than hidden inside the cost of the good units, so a bad run looks like a bad run.

Each completion is also scored against the product's standard cost, so a recipe that regularly runs over is visible rather than folklore.

Labour

If the recipe's steps name a work centre with an hourly rate, the minutes recorded on each work order are costed at that rate when the order is completed, and listed line by line on the cost breakdown. The rate used is the one in force when you complete the order, and it stays with the line — raising a centre's rate later does not change what an earlier build cost. Once a completion has costed a work order, its minutes and work centre are locked, even when you complete the order in parts. Record all its minutes and set its work centre before the first part; a later part adds no labour for it.

A work order whose step has no work centre cannot be priced. The completion still goes through, and the breakdown marks the labour figure as incomplete so nobody reads a lower number as the real one. Because the work centre is locked too, those minutes stay unpriced. To correct labour after a completion, complete again or unbuild what was built.

Taking a build back apart

An unbuild takes finished units back out of stock and returns the components they were built from. What comes back is what this order's own completions recorded for those components — the quantities and the value the stock ledger gave them at the time — never today's price and never the current recipe. The material that went to scrap and the labour spent do not come back; byproducts are taken back with the units.

You can unbuild part of an order, more than once, up to what it produced. Each unbuild draws on the recorded shares cumulatively, so several partial unbuilds add up to exactly one full one and can never return more than the order consumed. Draft an unbuild to review it first, or draft and post it in one go from the order (Unbuild…). Once posted it cannot be reversed — build again.

A damaged finished good you do not want to take apart is written off with the warehouse's scrap, the same way as any other damaged stock.

Where a batch came from and where it went

If a product is tracked by lot or by serial number, every completion records which lots went in and which lot or serials came out, and every unbuild records the reverse. Nothing extra to do: mark the order done as usual.

  • Components are taken from the lots the warehouse's removal strategy would pick — soonest expiry first, or oldest first — for exactly the quantity the recipe consumes. An expired lot is never used: expired stock leaves through scrap, not through a build. If you need particular lots, name them (the assistant's component_lots); the quantities you name must add up to what the completion consumes.
  • The finished product enters a new lot named after the order and the completion (MFG/00042/1), or the name you give. A serial-numbered product gets one serial per unit (MFG/00042-1, -2, …, continuing across completions), or the serials you list — exactly one per unit.
  • Taking a build apart returns lot-tracked components into a new lot (MFG/00042/UB1); serial-numbered components come back as the same serials that went in, because a serial is the unit's identity.

Traceability (Manufacturing → Traceability) shows the tree. Pick a lot or serial: upstream walks back through every completion to the raw lots and the supplier receipt each one arrived on; downstream walks forward through everything made from it to the customer deliveries each finished lot left on — the recall question. Each node names the order and completion; a lot that appears twice is marked instead of walked again. The list under the tree is the same facts as rows, exportable. An order's own screen has a Lots section with the same facts for that order.

What is not here yet: GS1 barcodes and labels, the regulatory reporting hooks, a recall workflow that writes the customer letters, and lots on completions made before this feature (they stay untracked).

What reaches the books

If the warehouse's stock accounting is switched on, every completion and unbuild already books its stock side there: components leave the inventory account, finished goods enter it, and the difference passes through the production (work-in-progress) account. Manufacturing clears what that leaves behind:

  • after a recipe build, the labour the build absorbed (credited to the labour absorbed account) and the value it scrapped (charged to scrap loss);
  • after an unbuild, the difference between what the finished units left at and what the components came back at (manufacturing variance).

Map the three accounts under Manufacturing → Settings → Accounting; the production account is the warehouse's and is shown there for reference. Journals post within a minute of the completion. One that cannot post is not lost: it waits as blocked with the reason - a closed accounting period (fix that first: reopen, then retry), an account not yet mapped, or the finance module missing - and a Retry puts it back in the queue once you have fixed the cause. A completion made without a recipe is booked too: its output entered stock at the product's standard value with nothing consumed, so that value clears the production account, the labour goes to labour absorbed and the remainder is booked as manufacturing variance - if your organisation expenses components elsewhere, map the variance account accordingly.

Completing or unbuilding into a month that has been hard-closed in finance is refused before anything moves, naming the period.

Planning what to make and buy

Manufacturing → Planning runs MRP: for every product with demand in the horizon (90 days by default), it nets confirmed sale orders, reorder rules and the components your open orders will still consume against what is on hand (less what is reserved) and what is already on its way (open manufacturing and purchase orders), and proposes what to make (the product has an active recipe) or buy, how many, the day it is required and the day it must be released — a build is laid backward on the work centres' calendars; a buy takes the reorder rule's or the supplier's lead days. A proposed build brings its components' demand with it, exactly as the build will consume them, so the components are proposed too.

Nothing is created by the run. Open a proposal and Accept: a build opens a draft manufacturing order due on the required date (accepting twice opens one order, not two); a buy is drafted in Purchasing — a purchase order for the product's supplier, or a request for quotation when it has none — and you land on it. If Purchasing cannot draft yet, the accept is refused and the proposal stays proposed. Accept all proposals on the planning header accepts every open proposal of the last run, drafting the buys as one document per supplier. Dismiss sets a proposal aside; the next run may propose it again. A new run replaces the proposals nobody acted on. The planning header shows when the last run happened, in your language and your own time zone, and its snapshot hash: run it again with nothing changed and you get the same hash and the same proposals.

A step's minutes on a recipe are for one run of the recipe; a bigger order takes more runs, so its work orders, its MRP release day and the capable date all grow with the quantity.

The run also lists reschedule exceptions: an open order that arrives after the demand it covers (expedite) or more than a day before it (delay), with the date it should have. It is a list to act on, not something the run changes.

Confirming an order lays its work orders on the work centres' calendars (shifts less downtime), forward from the order's scheduled start. If a step has no work centre or the centre has no calendar, the order still confirms and says why it is unscheduled. Schedule on the order re-lays it, backward from a due date when you give one. Each work centre's calendar panel shows the minutes planned on it against its calendar, day by day.

On an order's components section, Can we promise? asks for a quantity and a date and answers from stock and open supply — with look-ahead, so a promise today never takes what a later order already needs — and, when stock cannot, quotes the earliest day one build could finish on the routing's calendars (capacity only; the sentence says so).

Forecasts are not a demand source yet, capacity is treated as infinite, and the run is on demand — there is no nightly run. Subcontracting and product variants on recipes are not supported yet.

Asking the assistant

  • "Create a bill of materials for the oak desk: 4 legs, 1 top."
  • "Release version 2 of the desk recipe." (It will ask you to confirm — this changes what every future build uses.)
  • "Book version 2 of the desk recipe to go live on 1 October at 06:00." (Also confirmed first. "Cancel that booking" needs no confirmation — it removes a future change rather than making one.)
  • "Start a manufacturing order for 20 desks."
  • "Unbuild 2 of MFG/00042." (Confirmed first — stock moves and it cannot be undone. "Draft an unbuild of 2" only drafts.)
  • "Run MRP for the next 30 days." (Proposes only.)
  • "Accept the planned order for 8 widgets." (Confirmed first — it opens an order, or has Purchasing draft the purchase.)
  • "Accept all the proposals of the last MRP run." (Confirmed first — buys are drafted as one document per supplier.)
  • "Complete MFG/00042 — we used 2 rods instead of 3 and close it." (Confirmed first; a warning recipe asks you once more before recording the difference.)
  • "Can we promise 100 widgets by 5 October?"
  • "Which manufacturing orders are in progress?"
  • "What did order MFG/00042 cost?"

The assistant asks before anything that changes what future builds consume, or that moves stock.

Country and industry differences

Order numbering, default tracking and costing defaults come from installed packs (Manufacturing → Settings), not from the engine. An Albanian organisation numbers MFG-000042; an Italian one numbers MFG/2026/00042 and restarts each year. You can override any single parameter for your organisation, and every override records where the value came from.