Projects
Delivery projects, tasks, and due dates after a brief is approved.
Draft — needs review. First-pass user guide generated from the module documentation. Check flows and Concierge phrasings against the live dashboard before treating this page as canonical.
Purpose
Projects track delivery after a brief is approved: phases, status, tasks, and due dates, linked to an entity and optionally to the originating brief.
Open Projects from the launcher (/dashboard/projects).
Main flows
- Create a project for an entity (and link a brief if you have one).
- Add tasks and assign owners and due dates.
- Move work on the board as status changes.
- Log time from a task when timesheets are installed.
- Read ledger financials on the project Reporting tab. Posted analytic lines are shown per currency as integer minor units. A project with EUR cost and USD revenue shows both rows — the summary never picks the largest currency or blends them. The date window uses the journal
entry_date(the same date finance reports use), so a back-dated entry lands in that period.
Keys
Every project and task has a short key you can quote.
- A project is
PRJ-7. Its task key prefix (WEB) is set when you create it, or derived from the name if you leave it blank. - A task is
WEB-12. The number counts up per project and never skips. - The prefix cannot be changed later, so a key someone has already written in an email or a chat keeps pointing at the same task.
Type a key into the search box on the Projects list or the Tasks board to jump straight to it. The Concierge resolves a key in one step as well.
The task page
A task opens on two tabs.
- Task is everything you type about it, in full-width sections: Details (title, project, status, priority, readiness), People (assignee, contact, assignees, labels), Plan (dates, estimate, planned hours, work type, milestone, recurrence), Description (with Draft description with AI) and the work type's custom fields.
- Work is what happens to it: Progress (logged hours, progress, completed), then Workflow to change the status and see every move, Watch and Copy branch name, Timesheets, Attachments, Inspections, Relations, Comments and Activities.
Timesheets on a task are one table — date, description, billable, status and duration, with a total row and 10 entries per page. Click a draft entry's description or duration to edit it in place.
A new task is a single form: the Work tab appears once the task exists.
Site diary
A project's Site diary tab is a log of the days on site. Each entry is one day: what happened, the weather, how many people were there, and photos. Two people can log the same day; their entries sit together under that day, newest day first.
- Add a day: pick the day (today by default), then fill in any of weather, people on site, what happened and photos. An entry needs at least one of them.
- Edit an entry with the pencil, or Remove it with the bin (you are asked first). A removed entry leaves the diary but is kept.
- On the phone, open a project and tap Site diary: Add a day takes photos with the camera there and then.
Writing in the diary needs the same permission as posting a status update.
Photos on status updates
A status update (the Activity tab, or Post an update on the phone) can carry up to 20 photos. Each photo is checked for viruses before it can be added; one that is still being checked or fails the check is not added. The photos show as thumbnails under the update; click one to open it full size.
Editing many tasks at once
On Tasks or My tasks, tick the tasks and press Edit. Set the status, assignee, priority or due date, or add a label. Whatever you leave on No change stays as it is. If a workflow refuses a change, the dialog names each refused task and why. The others are already saved.
Moving a task to another project
On the task page, press Move to project and pick the project. The dialog shows what will happen before you confirm.
- The task gets the new project's next key. Its old key still finds it, and old links still open it.
- Its sub-tasks, time, comments and files go with it.
- Its milestone is cleared, and links to tasks left behind are removed. Dependencies stay.
- A task with invoiced time can't move, so invoiced records stay where they are.
Alerts
These arrive in the bell, once a day at 06:00 UTC, so they can be up to a day late.
- Due tomorrow. Each assignee hears about an open task the day before it's due. Changing the date reminds them again.
- Hours sold. Set Hours sold on the project's Overview tab. The project owner hears at 90% and at 100% of them. Selling more hours lets it alert again.
Working time
A work calendar says which hours and days count as work: a timezone, a working week (Monday–Friday 09:00–17:00 by default, split shifts allowed) and exceptions — holidays, closures (the whole day or part of it) and make-up working days.
- Open Projects › Config › Working time to create one. Pick a country and, for Germany or Switzerland, a Land or canton: the timezone and this year's and next year's public holidays are filled in for you. You can delete any holiday your company works, or add your own.
- One calendar is the default. A project or a person without their own calendar uses it. With no calendar at all, work is Monday–Friday 09:00–17:00 with no holidays.
- On a project's Gantt tab, the calendar picker changes which calendar the project uses. Holidays are tinted, and hovering shows their name.
- Swiss, Albanian and Kosovar holiday sets are marked review: cantonal holidays vary, and the Bajram dates are announced each year. Check the list after installing.
Dependencies and rescheduling
On a task page, Relations says what this task blocks and what blocks it. Each blocking link has a type and a lag:
- FS (finish → start, the default): the next task starts when this one finishes.
- SS (start → start), FF (finish → finish), SF (start → finish) for work that overlaps.
- Lag is in working hours on the project's calendar:
+8on an 8-hour day waits one working day, and a negative lag lets the next task start early.
Click the small FS chip on a link to change either. Use the link icon to connect a task in another project by its key (for example OPS-12). That task holds this project back, but rescheduling this project never moves it.
On the Gantt tab:
- Drag a bar to move a task, or focus it and press ← → to move it a day. The deadline stays where it is.
- Bars outlined in red are on the critical path: any delay to them delays the project.
- Reschedule works out the dates every dependency implies and shows you the list first. Tasks only ever move later. Nothing changes until you press Apply. If someone edits the plan in between, Apply is refused and you preview again.
- Capture baseline freezes today's plan. Pick a baseline to see where each task was meant to be as a thin line under its bar.
Workflows
A workflow is the set of statuses work moves through, which moves are allowed, and what each move checks or does. Every project uses the default workflow unless you give it its own.
Open Projects › Config › Workflows:
- Statuses are the board's columns. Each belongs to a category (backlog, not started, in progress, done, cancelled) — that is what tells the rest of the app whether work is open or finished. One status is where new work starts.
- Allowed moves is a grid: tick a box to allow moving from the row's status to the column's. The Any row allows a move from every status — that is how every workflow starts, so nothing changes until you untick something.
- Checks and actions hang off one move. A check refuses the move and says why ("all blockers done", "all sub-tasks done", "checklist complete", "only the assignee"). "A comment" asks the person for one and keeps it in the task's history. After a move you can set the priority, assign it, notify someone, or trigger your automations.
- Problems are listed above the editor: a status nobody can reach, or no starting status. Fix them before people meet them.
When a move is not allowed, the person is told exactly why — on the board, on the task page and in the Concierge. Every move is kept: the task page lists who moved it, when, from where, through which door, and any comment.
To put a project on a different workflow, use the workflow picker above its board. If tasks sit in statuses the new workflow does not have, you are asked where each one goes first.
Work types and custom fields
A work type is what kind of work something is — a bug, a change request, a site visit. Each type decides which workflow its tasks start in and which extra fields they carry. Everything already in the system is a plain Task or Project until you say otherwise.
Open Projects › Config › Work types:
- Types — add a type, give it a field scheme, and (for tasks) the workflow it starts in. One type per kind of work is the default; it cannot be deleted while anything uses it.
- Fields — define a field once (a label, a type, and the key its values are stored under), then tick it into a scheme. A field's key and type are fixed once it exists: changing either would misread everything already saved. Removing a field takes it off the forms and keeps the values, so an accidental removal is not a loss.
- Wording — call work what your organisation calls it. Set a singular and a plural, in English and in Italian; leave a row empty for the standard wording.
On the task page, the Kind of work panel shows the type and its fields. A money field is typed in whole units and stored to the cent with its currency; if the server refuses a value it says which field and why, right under that field.
One console for every screen
Every Projects screen — work types, workflows, calendars, packs and parameters, work items, events, workload — is the same console the rest of the product uses: a list you can search, filter with chips, narrow with your own conditions, group and switch to a board; a New door where the model allows one; and a record door for each row. What a screen has that the console does not (the transition matrix, a calendar's week grid, what a pack would install, saved views and the month calendar, the workload grid) sits under the console on the same page. Where creating happens somewhere else — a work item in its project, an allocation from the workload grid — the console says so instead of offering a thinner form.
Projects themselves are that console too. Projects lists them (search, chips, group by status or stage) with a board toggle for the drag view; New is a form; a project's record is its identity — name, key, status, stage, client, owner, dates, description — with everything the project has underneath: the task board and table, gantt, milestones, inspections, files, timesheets, updates, reporting, activity, the people on it. Archiving is a status: set it to Archived (or press Archive), and set anything else to restore. Stages — the board's columns — have a screen of their own under Configuration.
Tasks and My tasks are the same console over every project (the filter language, saved views, the month calendar) with a board toggle — the cross-project board, or your personal columns on My tasks, which pins assigned to me under everything you search. A task's record is its fields plus what only a task has: the workflow transition (the one way to change its status — it may be refused with reasons or ask for a comment), its people, labels, milestone, recurrence, custom fields, time, attachments, inspections, relations, comments and activities. An inspection's record shows the checklist runner under its identity.
The configuration screens follow the same rule. Tags (the labels tasks carry), Activity types (call, email, to-do, meeting — each with a default delay) and Inspection checklists are consoles with a New door and a record door; the checklist's checks are edited under its record, in the order they will be carried out, and saved as one list. Ask the Concierge the same things a person clicks: "Add an activity type 'Site visit', a meeting, due in three days.", "Rename the Urgent tag to Blocker.", "Retire the old handover checklist."
Work items, saved filters and the calendar
Projects › Work items shows work from every project in one place.
- Chips narrow it: Open, Mine, Overdue, High priority. They combine — picking two means both.
- Search takes a work key (
WEB-12) or part of a title. - Sort and Group by are real: the count next to a group is the count in the whole result, not just the page you can see.
- Export CSV exports everything the filter matches, not the visible page.
- Calendar shows the same work by day. A task planned for a date has no time of day and sits on that date, in your timezone — it will not drift to the day before. A month with more work than fits says so rather than quietly leaving some out.
Saved views keep a filter by name. Save one for yourself, or share it with everyone — a shared view carries a people icon, and changing or deleting one needs permission to configure projects. Star a view to make it the one that opens first. Views live on the server, so one saved at your desk is there on your phone.
Which views a project offers, and which opens first, is a view scheme — set per project, or once for the whole organisation.
Workload and capacity
Projects › Workload shows each person's days (or weeks) as coloured cells: how much of their time is allocated against how much they actually have.
- Capacity is the person's working calendar × their FTE, minus approved leave. It is worked out fresh every time — nothing is stored that could go stale.
- Allocations are planned (a sketch) or committed (a promise), to a task or a whole project, over a span of days, at a share of the working day. 100% is the whole day. More than 100% is allowed on purpose, so an over-commitment is visible rather than hidden.
- Actual hours come from timesheets and are shown beside the plan, never mixed into it.
- A red cell is an overload. Approving someone's leave under an existing allocation turns that day red too: the promise is still there and there is nobody to keep it. That is the conflict, not a mistake in the screen.
- Click a cell to see the allocations behind it, add one, change its kind, or remove it.
The Concierge can ask "who is over-allocated next month?" and gets intervals with a peak day, not a yes/no.
Events and automations
Every change to a work item or a project — created, moved to another status, a field edited, assigned, a project's status changed — is written as an event in the same database transaction as the change itself, and handed to the automations engine shortly after. Because it is written with the change, an event cannot be lost between the two.
Projects › Config › Events shows them: pending (not yet delivered), delivered, or failed with the error and the number of attempts. A failed event can be retried. If the automations module is not installed, events are still recorded and the screen says nobody is listening.
To act on one, create an automation with module projects and entity type task (or project), for example when a task's status is set to Done, notify the project manager. "Overdue" is a time-based automation on a task's due_date; it fires once per due date.
An automation that changes a task produces a new event, and that event knows it was caused by an automation, so a rule cannot trigger itself in a loop.
Packs
Projects › Config › Packs lists two kinds of ready-made setup:
- A country pack brings the public holidays of a country (by region where they differ), a default working week in the right time zone, the numbering formats and a few parameters such as hours per day and the budget currency. The one matching your organisation's country is marked active; installing it creates a working calendar with the holidays already in it.
- An industry pack brings the kinds of work a team in that trade uses — epics and bugs for software, deliverables and revisions for an agency, snags and RFIs on a site, matters and filings in a practice — with their workflows, fields, wording, default views and, for construction, safety and handover checklists.
Open a pack to see exactly what it would write before you install it. Installing creates ordinary work types, workflows, fields and calendars that you can rename or delete afterwards; installing the same version again changes nothing. Uninstalling only removes the "installed" mark — what the pack created stays yours.
Work parameters apply from a day: setting hours per day to 7 from 1 July keeps the 8 that applied before it on record, so anything computed for June still uses 8.
Concierge phrasings
-
"Allocate Ana to the website redesign, full time, for the first two weeks of October."
-
"Is anyone over-allocated next month?"
-
"How much capacity does the design team have in November?"
-
"Why didn't my 'notify on Done' automation run for WEB-12?"
-
"Retry the failed events from this morning."
-
"Install the construction pack and show me the checklists it added."
-
"What holidays does the German pack have for Bavaria?"
-
"Set hours per day to 7 from the first of July."
-
"Show me my overdue work."
-
"Save this as 'My overdue bugs'."
-
"What's due next week on the website project?"
-
"Add a Change request type with a required cost impact."
-
"What kinds of work can I log?"
-
"Call tasks 'requests' here."
-
"Why can't I move WEB-12 to Done?"
-
"Move WEB-12 to In review — the comment is: waiting on the client."
-
"Require a comment when anything moves to Cancelled."
-
"Reschedule the website project and show me what moves."
-
"Make WEB-7 start two days after WEB-4 finishes."
-
"Are we behind the kick-off plan?"
-
"Create a Munich calendar with Bavarian holidays and make it the default."
-
"If WEB-12 starts Friday at 14:00 and takes 16 hours, when does it finish?"
-
"What's the status of WEB-12?"
-
"Create a project for the Acme website rebuild."
-
"Add a task: write homepage copy, due Friday."
-
"What is overdue on project PRJ-3?"
-
"What happened on the Casa Verde site last week?"
-
"Log today on the Casa Verde site: slab poured, 6 people, rain until 10."